At a glance
| Job | Main equipment | Support |
|---|---|---|
| Slab, floor or sidewalk | Backhoe with breaker | Floor saw · skid steer |
| Footings and low walls | Backhoe with breaker | Front bucket or skid steer to load |
| Rock or large volume | 20 t excavator (unit with breaker hydraulics) | The same excavator loads the truck |
| Detail or indoor work | C185 compressor + your pneumatic tool | S18 skid steer for rubble |
| At night or next to traffic | Light tower · message board | — |
First: what you're demolishing
The machine isn't chosen by the word 'demolition' but by material, volume and space. Before quoting, sort your job into one of these cases — many sites have two or three at once:
- A concrete slab, floor, sidewalk or ramp to remove.
- Footings, low walls, equipment pads or short columns.
- Rock or very hard material that shows up while digging.
- Detail or indoor work: opening a doorway, chipping a floor, removing a finish.
- Structural demolition (buildings, elevated slabs, load-bearing walls): it needs a plan made by a responsible professional. This guide is about equipment and doesn't replace that plan.
Backhoe plus breaker: the workhorse combo
For most medium demolition, a backhoe with a hydraulic breaker solves two jobs with one machine: it breaks at the back and loads at the front. The fleet's breaker, the SIMAQ DB 60V, mounts on the backhoe, is installed by group technicians and has a silenced housing that lowers noise on urban sites. It rents with the backhoe or on its own if you already have a compatible backhoe: say so when you quote to confirm the mount.
The fleet's backhoes are 4×4: the Komatsu WB93R-5E0 (about 99 HP, front bucket of around 1.0 m³) and the Bobcat B760, with an extendable dipper on 4 of its 5 units. The front bucket is what then loads the rubble onto the truck.

When to step up to the 20 t excavator
If there's rock, a lot of volume or you need reach, the Komatsu PC200-10M0 CE excavator (20.3 t operating weight and 138 net HP) has the mass and stability a backhoe doesn't. One of the fleet's excavators is set up with breaker hydraulics: ask for it by that when you quote and confirm which breaker goes with it. The same machine, with a bucket, loads the haul trucks.

Cut before you break
When you're removing only part of a slab or floor, cut the perimeter first with the floor saw. A straight cut separates what goes from what stays: the breaker works up to the line without cracking the neighbouring concrete. The fleet's SIMAQ SQ16 PRO saw has a 13 HP Honda GX390 engine, diamond blade included, adjustable cut depth and a straight-cut guide; it cuts slab, concrete and asphalt.

Compressor: when the work uses pneumatic tools
Indoors, next to structures that stay or where a machine can't fit, demolition is done with handheld pneumatic tools. The fleet's Doosan C185 compressor delivers 185 CFM of air, is a single-axle towable — it goes to the work face behind a pickup — and its enclosed canopy makes less noise on urban sites. The compressor is what rents; confirm the tool you'll connect when you quote.

Getting the rubble out
Rubble left on site slows everything else. A Bobcat skid steer gathers and loads it: the S590 lifts around 998 kg on a vertical-path arm that reaches high-sided trucks; the S18 is the compact format that fits where the site gets tight, with 10 units in the fleet. If the backhoe is already on site, its front bucket loads too.

Safety, neighbours and hours
- Shut off and confirm utilities (water, power, gas) before breaking.
- Protective gear for everyone nearby: glasses, hearing protection, gloves and boots.
- Wet the area to keep dust down and fence off the machine's work zone.
- Respect the noise hours your municipality sets: a silenced breaker helps, but it doesn't make it silent.
- If you work at night or next to traffic, add a light tower and a variable message board.
Common mistakes
- Renting the breaker without confirming it fits your backhoe.
- Breaking part of a slab without cutting first: what should stay ends up cracked.
- Using the breaker as a pry bar or firing it into thin air: it damages the tool, and damage beyond normal wear is billed.
- Forgetting equipment to haul rubble: the site fills up and the demolition machine sits waiting.
- Starting without shutting off utilities or warning the neighbours.
Frequently asked questions
Can I rent the hydraulic breaker without the backhoe?
Yes: the SIMAQ DB 60V breaker rents with or without the backhoe. If you're using your own backhoe, say so when you quote to confirm the mount; group technicians do the installation.
What's best for breaking rock while digging?
If there's a little, the backhoe with breaker. If there's a lot or it's very hard, the 20 t excavator: one fleet unit has breaker hydraulics. Ask for it that way when you quote and confirm which breaker goes with it.
What's the compressor for in a demolition?
To power handheld pneumatic tools where a machine can't fit or shouldn't be: indoors, openings, next to structures that stay. The Doosan C185 delivers 185 CFM and tows behind a pickup.
Can I rent the backhoe with an operator for demolition?
Yes. The backhoe and the excavator rent with or without a certified operator. In demolition, where skill matters, operated rental is usually the safe choice if you don't have an operator with hours on that machine.
How is the breaker charged?
Like the rest of the equipment: by the day, week, 15 days or month, with maintenance included. If there's a current published rate, it's on its page with its date; otherwise it's quoted on your term and site.
Equipment in this guide
Add them to your quote with the + button and send them together, with dates, in a single request.
SIMAQ DB 60V Hydraulic Breaker for BackhoeBreaks concrete and rock mounted on the backhoe — without buying the attachment.
Get a quote
Komatsu WB93R-5E0 Backhoe LoaderDigs in the back, loads in the front: two machines in one rental.
Get a quote
Bobcat B760 Backhoe Loader4×4 backhoe with extendable dipper for deep trench and agile loading.
Get a quote
Komatsu PC200-10M0 CE ExcavatorThe 20-tonne excavator that carries the heavy stage of the job.
Get a quote